Slabh

UV coating production line using roller

Category:

This line is for primer only (with the option to choose primer + top coat)
Machine setup is simple, even for those unqualified or with little experience with roller coating lines.
Downtime must be reduced in every possible way, in order to increase production efficiency and accelerate return on investment.
Equipment is easily accessible, allowing maintenance or cleaning tasks to be performed quickly.
The process, including paint consumption and paint quality assessment, must be controlled and adjusted as needed in real time.

Model  RRCL-600 RRCL-900 RRCL-1300
Dust Collector
Working width 600mm 900mm 1300mm
Working thickness 3-80mm 3-80mm 3-80mm
Minimum length 300mm 300mm 300mm
Feeding speed 0-20m/min 0-20m/min 0-20m/min
Feeding power 0.4kw 0.75kw 0.75kw
Putty Filling Machine
Working width 600mm 900mm 1300mm
Working thickness 3-80mm 3-80mm 3-80mm
Minimum length 300mm 300mm 300mm
Feeding speed 0-20m/min 0-20m/min 0-20m/min
Coating power 0.75kw 1.5kw 1.5kw
Feeding power 0.75kw 1.5kw 1.5kw
Double/Three-light UV Dryer
Working width 600mm 900mm 1300mm
Working thickness 3-80mm 3-80mm 3-80mm
Minimum length 300mm 300mm 300mm
Feeding speed 0-20m/min 0-20m/min 0-20m/min
Lamp power 5kw 8kw 11kw
Feeding power 0.4kw 0.75kw 0.75kw

Category:

Recently Viewed Products

No recently viewed products to display